The Complete Fire Systems Checklist for Fuel Stations

Fuel Station — Fire Systems Checklist
Fire Systems Checklist

Fuel Station Fire Systems Checklist

Service stations are classified as Class 6 buildings under NCC 2022 (A6G7). This checklist covers both the Class 6 building/shop requirements and the fuel storage & dispensing infrastructure, which is regulated separately under AS 1940 and state dangerous goods legislation.

Site / station reference:  

Part A — Building (NCC Class 6) Requirements

🏢 Applies to the shop / convenience store component and canopy structure. Clause references are to NCC 2022 Volume One.

1. Sprinklers

  • Sprinklers required throughout the whole building if any part has an effective height of more than 25 mNCC E1D5
  • Sprinklers required in Class 6 fire compartment(s) with a floor area of more than 3,500 m²NCC E1D8(a)
  • Sprinklers required in Class 6 fire compartment(s) with a volume of more than 21,000 m³NCC E1D8(b)

2. Fire Hydrants

  • Fire hydrant system required where total floor area is more than 500 m²NCC E1D2(1)(a)
  • ...and a fire brigade station is within 50 km (by road) and equipped to use a hydrantNCC E1D2(1)(b)
  • Fire hydrant system must be installed in accordance with AS 2419.1NCC E1D2(2)

3. Fire Hose Reels

  • Fire hose reel system required to serve the whole building where internal hydrants are installedNCC E1D3(2)(a)
  • Where hydrants are not installed, required in any fire compartment with floor area more than 500 m²NCC E1D3(2)(b)

4. Portable Fire Extinguishers

  • Class B extinguishers where more than 50 L of flammable liquid is stored/used (excl. vehicle fuel tanks)NCC E1D14(3)(c)
  • Class A extinguishers in occupied compartments under 500 m² without fire hose reelsNCC E1D14(3)(d)
  • Extinguishers for Class AE/E risks at emergency services switchboardsNCC E1D14(3)(a)
  • Selection, location and distribution to comply with AS 2444NCC E1D14(1)(c)

5. Emergency Lighting

  • Required in every room/space with public access on a storey if floor area is more than 300 m²NCC E4D2(f)(i)
  • ...or any point on that floor is more than 20 m from the nearest exit/road/open spaceNCC E4D2(f)(ii)
  • Design/operation must comply with AS/NZS 2293.1NCC E4D4

6. Exit Signs

  • Exit sign at every door providing direct egress to a required exitNCC E4D5(a)
  • Exit signs must comply with AS/NZS 2293.1 (or Spec 25 if photoluminescent)NCC E4D8(a)

Part B — Fuel Storage & Dispensing

⛽ Applies to tanks, pumps and the dispensing apron. Not covered by the NCC — governed by AS 1940 and state dangerous goods regulations. Confirm current requirements with your dangerous goods regulator.

7. Dispensing Area

  • Portable fire extinguishers provided at each dispensing island, within specified travel distanceAS 1940
  • Emergency isolation switch provided to shut down all pumps, clearly signed and accessible from the shop counterAS 1940 / DG Regs
  • "No Smoking" and naked-flame prohibition signage displayed at the dispensing area and tank fill pointsAS 1940 / DG Regs
  • Static earthing / bonding point provided for tanker deliveriesAS 1940
  • Spill containment / bunding provided around tanks and the dispensing apronAS 1940 / EPA

8. Fuel Storage

  • Tank vent pipes fitted with flame arrestors and terminated at a safe height/locationAS 1940
  • Overfill prevention and tank gauging/leak detection systems installed and functionalAS 1940 / DG Regs
  • Separation distances maintained between tanks, dispensers, boundaries and ignition sourcesAS 1940
  • Underground/aboveground tank installation certified and registered with the relevant authorityState DG Regs

9. Canopy

  • Canopy over dispensing area constructed of non-combustible materialsAS 1940 / NCC C-provisions
  • Adequate clearance maintained between canopy fascia/signage and any ignition sourcesAS 1940
  • Canopy structure classified and assessed separately if a distinct classification applies (e.g. Class 10a)NCC A6

Two frameworks, one site — ticking off the shop's fire extinguishers tells you nothing about your tank overfill protection, and vice versa.


Using This Checklist

Assign an Owner

One person on site should be responsible for working through the checklist and following up on anything that fails.

Set a Rhythm

A quick visual check weekly, and a full walk-through against every item quarterly — always after any site changes.

Bring in the Professionals

The checklist tells you what to look for; sprinklers, hydrants and tank monitoring still need a qualified fire protection contractor to test.

Keep Records

Date and initial each completed checklist and file it — your best evidence of due diligence if an insurer or regulator ever asks.

Need Help Working Through This Checklist?

If you're unsure whether a particular system applies to your site, or it's time for periodic testing and servicing, get in touch and we'll work through it with you.

Get in Touch
Note: this is a working extract for preliminary reference only. Part A is drawn from the Deemed-to-Satisfy Provisions of NCC 2022 Volume One (confirm state/territory variations and Performance Solutions). Part B reflects general AS 1940 / dangerous goods practice — verify exact clause numbers and quantities against the current standard and your local regulator before use.